| Each autoclave has its own controller, which operates on its own local P-NET, and all the autoclaves are interconnected within a larger P-NET. A waste heat recovery system is installed in the basement. This system is also controlled via P-NET. A number of PC's collect data from the P-NETs throughout the entire factory. These data are send to an IBM administrative system via an IBM Token-Ring, which can then be processed and displayed on any PC on the network. The factory has its own department for designing, installing and programming the automatic systems. The first P-NET was installed in 1988 and every year, the plant has been extended. |
![]() |
|||||
| Scope of P-NET installation: 4000 Digital Input/Output 200 Analog Input (Pt100, 4-20mA) 30 Controllers with 68000 CPU 4000 meters of P-NET cable |
|
|
|
|
||||
|
|